Natural gas
Continuous and peaking operation for industrial parks, distributed generation, standby power and CHP/CCHP.

Gas engine generator sets
Generator sets and auxiliary systems are configured around fuel composition, load profile, grid conditions, heat demand and environmental constraints.
Send fuel and load dataFuel-led selection
Selection considers composition, heating-value variation, impurities, ambient temperature, altitude, operating hours and heat demand alongside rated output. Parameters require gas analysis and project verification.


Continuous and peaking operation for industrial parks, distributed generation, standby power and CHP/CCHP.
Define cleaning, pressure regulation and engine suitability from composition, moisture, sulphur compounds and heating value.
Coordinate gas treatment, control strategies and generator packages for variable heating values and impurities.
Fuel analysis, suitability screening and technical assessment for coke-oven gas, syngas and other special fuels.
Published model references
Published model families support preliminary selection. Brand names and parameters do not imply authorization, stock or a supply commitment.
| Brand | Series | Typical model families | Reference application |
|---|---|---|---|
| INNIO Jenbacher | Type 3 | J312 / J316 / J320 | Small / medium distributed energy, biogas & industrial gases |
| INNIO Jenbacher | Type 4 | J412 / J416 / J420 | Medium-scale generation, CHP & industrial parks |
| INNIO Jenbacher | Type 6 | J612 / J616 / J620 / J624 | Large-scale CHP & industrial energy centres |
| MWM | TCG 2020 | V12 / V16 / V20 | Approx. 1–2 MW class; verify fuel and version |
| MWM | TCG 2032 | V12 / V16 / 2032B V16 | 50 Hz:3,333 / 4,300 / 4,500 kWel |
Published electrical efficiency: approx. 43.9%–44.6%. Output and efficiency depend on fuel, emissions configuration, frequency, altitude and ambient conditions.
Package scope
For stable fuel supply and high annual operating hours, with emphasis on efficiency, availability and maintenance planning.
Recover jacket-water and exhaust heat for steam, hot water, cooling or process heat.
Assess rapid starts, grid controls, black-start capability and multi-unit operation as project-specific options.
Project information
Include location, ambient conditions, grid voltage, operating mode, heat demand and delivery schedule.